Huckleberry Mine

JDS delivered design-build, self-perform services for Hope Brook Mining Limited's comprehensive tailings and water management system in 2013. The project included over 12km of HDPE pipeline transporting tailings to a new Cyclone Sand Plant for coarse sand separation and dam construction material, installation of 600hp and 200hp booster pumps, a complete CSP facility with pre-engineered building, new reclaim water barge and pump infrastructure at TMF-3, 5km of reclaim water pipeline, seepage control systems, and 5.5km of 13.8kV overhead power line. The project was completed on time, under budget, with zero lost-time injuries.

Previous
Previous

Hope Bay Mill Load Out

Next
Next

Three Bluffs Project