Madsen Gold Project

Project Overview

The Madsen Gold Project is a precious metals resource project located in the Red Lake district of Northwestern Ontario. Based on Probable Reserves, a subset of the Indicated Resource category, the Project will develop a mining and processing operation with mining from five zones near the Madsen Mine over a 12-year production period by way of an extension of the existing ramp and an overhauled shaft access underground mine, an expanded and refurbished cyanidation gold extraction processing facility capable of processing ore at an average rate of 800 tonnes per day (tpd), a cyanide destruction circuit, an upgraded tailings management facility, a water treatment plant and related infrastructure.

Project Scope

JDS was commissioned in 2017 by Pure Gold Mining Inc. to lead the Feasibility Study of its 100% owned Madsen Gold Project in Red Lake, Ontario. JDS managed all aspects of the Feasibility Study including the contributing third party consultants to ensure an efficient and fit-for-purpose outcome aligned with permitting requirements.

Economic highlights of the FS include an after-tax NPV5% and IRR of $247M and 35.94% respectively and an after-tax payback of 3.4 years.

Company
Pure Gold Mining

Location
Red Lake, ON

Value
$2M